Basic principles, Role/responsibility of Quantity surveyor at various stages of construction Estimate-Details required, Type of estimate, purposes. Contingencies, Work-charge establishment, Tools and Plant, centage charge, Day work, Prime cost, Provisional sum & provisional Quantity, Overhead charges, Cost index, Contract documents (Brief description only) Bill of Quantity -Typical format-use Item of works- Identify various item of work from the drawings-units of measurement of various materials and works (focus may give to RCC residential building) General rule & method of measurement with reference to Indian Standard SpecificationsIS12
Introduction to the use of schedule of rates as per latest DSR and Analysis of rate as per latest DAR Specifications-General specification of all items of a residential building. Detailed specification (CPWD specifications) of major item of work like Earth work excavation in foundation, masonry, Reinforced cement concrete, finishing of building work Analysis of rates for Earth work in excavation for foundation, mortars, reinforced cement concrete Works, finishing work, masonry work, stone works, flooring with reference to DSR.
Detailed Estimate- Preparation of detailed measurement using Centre line method & Short wall long wall (separate wall) method for RCC single storied building.